Project Spotlight: Delivering a Mega-Order of 56 Heavy-Duty Dock to Ground Ramps in 30 Days

At HANMOKE, we thrive on large-scale challenges that test our engineering, manufacturing, and logistical prowess. We are proud to announce the successful completion and installation of a monumental project: 56 custom-built Dock to Ground Ramps for a major national logistics hub. This mega-order, from contract to fully operational site, was executed in an impressive 30-day timeline, showcasing our commitment to delivering not just products, but comprehensive, turnkey solutions on schedule.

Project Overview: Scaling Up for a Logistics Giant

The client, a leader in supply chain and distribution, needed to equip a vast new cross-docking facility with robust, reliable, and high-capacity ground access points. Their requirement was clear: dozens of identical, heavy-duty ramps to facilitate the rapid, safe flow of materials between ground-level yards and their dock positions for a variety of equipment.

This was not a task for standard, off-the-shelf equipment. It demanded precision, scale, and speed—a perfect match for our integrated manufacturing and project execution capabilities.

Engineering the Workhorse: The 20-Ton Pure Incline Ramp

Each of the 56 units was built to exacting, heavy-duty specifications to serve as the backbone of the facility’s outdoor material handling.

  • Design: Pure incline (Dock to Ground) ramp, optimized for continuous, high-cycle traffic.
  • Critical Dimensions: A substantial 13-meter length (including integrated approach/departure plates) and a generous 4400mm (4.4m) overall width, creating a wide, stable channel for simultaneous or large equipment movement.
  • Load Capacity: Engineered for a rigorous 20-ton dynamic load, confidently supporting laden multi-ton forklifts, heavy machinery on tracks, and other demanding cargo.
  • Key Features:
    • Durability-First Decking: Hot-dip galvanized steel grating was selected for its exceptional combination of strength, slip resistance, and complete corrosion protection. This ensures long-term performance with minimal maintenance, critical for an outdoor, all-weather application.
    • Full Mobility: Designed as a mobile unit, allowing the client to reposition ramps as yard layouts and operational needs evolve.
    • Universal Access: The pure slope design provides essential access for a range of equipment: forklifts moving pallets, telehandlers with bulky goods, and even small mobile cranes requiring stable ground-to-dock transition.
The 30-Day Sprint: From Order to Operational

The client’s aggressive project timeline made this delivery a significant undertaking. Our success was rooted in a seamless, multi-departmental workflow:

  1. Precision Planning & Kitting (Days 1-5): Upon order confirmation, our engineering team finalized all custom drawings. Simultaneously, procurement activated to secure bulk materials, and production planning created an optimized, parallel assembly schedule for 56 units.
  2. Parallelized Production in Our Facility (Days 6-25): Leveraging our 20,000 sqm manufacturing space, we executed a production-line approach. Structural fabrication, grating panel preparation, and leg assembly occurred concurrently. Quality checks were integrated at every stage to ensure all 56 ramps met identical, high standards.
  3. Coordinated Logistics & Staging (Days 20-28): A dedicated logistics plan was activated. Completed ramps were systematically prepared for shipment, with sequencing coordinated to match the installation schedule at the client’s site.
  4. On-Site Installation & Commissioning (Days 28-30): Our trained installation team worked efficiently on-site, positioning, levelling, and finalizing each ramp. The client received a fully functional fleet, ready for immediate operation on Day 30.
Why This Project Highlights the HANMOKE Difference

This mega-order exemplifies what sets us apart as a direct manufacturer and solution provider:

  • Capacity for Scale: We have the factory floor space, skilled workforce, and supply chain relationships to handle large-volume orders without compromising quality or lead time.
  • Agile Project Execution: Our vertical integration—controlling design, sourcing, fabrication, and installation—allows for unparalleled coordination and speed on complex projects.
  • Engineering for Real Demands: We don’t just build ramps; we engineer material flow solutions. Understanding the need for 20-ton capacity, galvanized durability, and mobile flexibility was key to this project’s success.
Conclusion

The successful delivery of 56 custom Dock to Ground Ramps in 30 days is more than an order fulfillment; it’s a testament to our capability as a strategic partner for large-scale industrial and logistics developments. We provide the engineering integrity, manufacturing muscle, and project discipline needed to turn ambitious blueprints into operational reality.

Are you planning a large-scale facility or a fleet-wide equipment upgrade? Partner with a manufacturer that has proven it can deliver scale, speed, and substance.

Contact HANMOKE today to discuss how we can engineer and execute your next major project.

Share your love

留下评论

您的邮箱地址不会被公开。 必填项已用 * 标注

Secure Payments
Tellus gravida ipsum aut facilisis tempus at et aliquam estsem.
Free Shipping
Non pulvinar aenean ultrices lectus vitae imperdiet aeu.
24/7 Support
Nullam iaculis vestibulum arcu id urnain pellentesque quis.
Gifts & Sales
Aliquet ullamcorper leo mi vel sit pretium euismod eget libero.