🏠 Home
›
Edge of Dock Leveler
›
Edge of Dock Leveler with Support Frame
Edge of Dock Leveler with Support Frame – Retrofit Without Pit Work
The Edge of Dock Leveler with Support Frame adds a fully welded structural steel support frame beneath the proven no-pit edge-of-dock deck. Instead of anchoring into the dock face, the free-standing frame is bolted to the approach slab, so the leveler can be fitted to docks with no embedded channels, cracked or low-strength concrete faces, or dock edges that cannot take welding. The frame also raises the whole assembly to match floor levels on raised platforms.
Capacity covers 6–10 t (13,200–22,000 lb) as standard with heavier ratings on request. Choose spring-assisted manual operation or a push-button hydraulic power pack; both versions use the same 1,830 mm (72″) checker plate deck and 400 mm (15.7″) lip as our edge of dock leveler range, and store flush with the dock floor when not in use.
Capacity: 6–10 t (13,200–22,000 lb), custom to 20 t | Deck Width: 1,830 mm (72″) typical | Lip: 400 mm (15.7″) | Working Range: ±125 mm (±5″) typical | Mounting: welded support frame, no pit | Model: SX-EOD-183F
Key Features
- Free-standing welded support frame – carries the full load; no reliance on the dock face concrete
- Bolt-on installation – anchors into the approach slab; no embedded channels, no wet trades at the dock edge
- 6–10 t standard capacity (13,200–22,000 lb) – heavier ratings and wider decks manufactured to order
- Spring or hydraulic operation – manual lever version works power-free; hydraulic version gives push-button lift in ≤ 30 s
- 1,830 mm (72″) checker plate deck – anti-slip, self-draining, with arch-reinforced 400 mm lip
- Stores flush with the dock – walk-over surface when idle; dock seals and doors close normally
- Full frame powder coating – blast-prepared steel with marine-grade top coat for outdoor docks
- Retrofit friendly – ideal for leased buildings, older docks and temporary platform conversions
Specifications
| Parameter | Value |
|---|---|
| Rated capacity | 6–10 t (13,200–22,000 lb) standard; heavier ratings on request |
| Deck width | 1,830 mm (72 in) typical; customised to dock door width |
| Lip | 400 mm (15.7 in) long, arch-reinforced chequer + flat plate composite |
| Working range | Typically ±125 mm (±5 in); confirmed per dock survey |
| Support frame | Fully welded structural steel frame, bolt-down base plates |
| Operation | Spring-assisted manual lever, or hydraulic power pack (push button, ≤ 30 s cycle) |
| Power (hydraulic version) | 380V / 220V / 415V / 24V, 0.75 kW; voltage customised to site supply |
| Surface treatment | Blast cleaning + powder/marine polyurethane coats |
| Impact protection | Laminated rubber bumpers 300×200×100 mm (11.8×7.9×3.9 in) on steel brackets |
| Standard supply | Deck assembly, lip assembly, support frame, lever/power pack, bumpers, anchor set |
| Documentation | Installation drawing, anchor plan, operation manual, certificate of conformity |
| Warranty | 12 months on the complete unit (normal use) |
Exact deck size, frame height and lip length are engineered to each dock survey — send drawings for a free fit check. Precise figures are confirmed on the approval drawing, not pre-assumed.
Which Edge of Dock Version Fits Your Dock?
| Dock Condition | Mounting | Recommended Model |
|---|---|---|
| Dock face with embedded channel / sound concrete | Direct face-mount | Mechanical Edge of Dock Leveler |
| Dock face without embedments / weak concrete / leased site | Support frame, bolt-on | This model (SX-EOD-183F) |
| Push-button operation required | Hydraulic power pack | Electric Hydraulic Edge of Dock Leveler |
Application Scenarios
Bolt-on frame leaves the building fabric intact — landlord-friendly retrofit.
Load goes into the slab through the frame, not the dock edge concrete.
Quick installation with minimal civil work and no production downtime.
Marine-grade coating and laminated bumpers stand up to weather and trailer impacts.
Frequently Asked Questions
Why choose a support frame version instead of direct face-mounting?
When the dock face has no embedded channels, the concrete is cracked or low strength, or the building is leased and cannot be modified, the support frame carries the loading instead of the dock edge. It bolts to the approach slab and keeps the no-pit advantage.
What capacity can the support frame version carry?
Standard configurations cover 6–10 t (13,200–22,000 lb). With an uprated frame, 15 t and 20 t ratings are possible — capacity is confirmed on the approval drawing after the dock survey.
Does the frame need a pit or civil work?
No pit is required. Only anchor bolts into the approach slab are needed; our installation drawing gives the anchor pattern and torque values.
Can I get hydraulic operation on this model?
Yes — the same frame accepts the hydraulic power pack used on our Electric Hydraulic Edge of Dock Leveler, giving push-button lift in under 30 seconds.
Get in Touch
You may also like: Mechanical Edge of Dock Leveler | Electric Hydraulic Edge of Dock Leveler | Hydraulic Dock Leveler 10T
🔗 Related Product Categories








评价
目前还没有评价